top of page

Georgia Pacific Naheola Air Washer

Factory
Renovation

Renovation of Factory

Pennington, AL 36916, USA

SP Engineering surveyed an existing chiller and cooling tower system at the GP Naheola plant in Pennington, AL and created construction documents for the replacement of the chiller, refurbishment of the cooling towers, and installation of a new 86,500 CFM air washer. All new piping installed was stainless steel and the new washer ductwork was a massive 84” diameter.

86,500 CFM
Mechanical

4480 Halls Mill Rd, Bldg 3F
Mobile, Alabama 36693

Monday - Thursday:    8am - 5pm 

Friday:                              8am - Noon

Saturday & Sunday:    Closed

© 1999 - 2022 SP Engineering, Inc.

  • Facebook
  • Twitter
bottom of page