top of page


Industrial | Commercial
Georgia Pacific Naheola Air Washer
SP Engineering surveyed an existing chiller and cooling tower system at the GP Naheola plant in Pennington, AL and created construction documents for the replacement of the chiller, refurbishment of the cooling towers, and installation of a new 86,500 CFM air washer. All new piping installed was stainless steel and the new washer ductwork was a massive 84” diameter.

bottom of page